Yesterday my App broke and I don’t know what happened.
Suddenly it was not possible to synch for the user with error “table columns mismatch blabla”. I wondered because I did not change the tables and the error says a 12 column table has now 45 columns.
In edit mode I got lots of error messages until I recognised that AppSheet messed up 2 tables. So it seems the tables exchanged in the App editor without changing anything in the gSheet database. Now I am afraid both tables are broken and I am about to loose all the column settings and formulas.
I tried to restore an old version, but all the old versions have the same problem. Any idea how to get back the old table settings and why this happened?